News

Brace for Traffic Chaos: Lagos Announces 110-Day Partial Closure of Oworonshoki Bridge Starting Date Revealed

Spread the love

This post has already been read at least 112469 times!

Commuters in Lagos should prepare for major disruptions as the Lagos State Government has announced a 110-day partial closure of the Oworonshoki/Third Axial Bridge for urgent repair works, beginning Tuesday, May 6 through Tuesday, September 23, 2025.

In a statement issued by the Ministry of Transportation, the repair project will unfold in eight phases, targeting both inbound and outbound lanes of the busy bridge. Phases 1 to 4 will focus on the inbound stretch leading to the Third Mainland Bridge from May 6 to July 14, while Phases 5 to 8 will cover the outbound section from July 15 to September 23.

Motorists will be diverted 50 meters before and after each work zone, and the state government has outlined a series of alternative routes to minimize disruptions. Commuters heading to Victoria Island and Oshodi from major corridors like Lagos-Ibadan Expressway, Ikeja, and Maryland are advised to reroute through Ikorodu Road, Funsho Williams Avenue, and Eko Bridge.

Similarly, those returning from the Island to areas like Alapere, Ketu, and Mowe are encouraged to bypass the construction area using Ojota, Ketu, and Abiola Garden ramps.

Commissioner for Transportation, Mr. Oluwaseun Osiyemi, assured residents that LASTMA officers will be deployed to critical junctions to manage traffic and reduce congestion during the repair period.

He appealed to Lagosians for patience, emphasizing that the partial closure is a necessary inconvenience to ensure long-term safety and durability of the bridge’s expansion joints.

“Motorists are implored to be patient as the partial bridge closure is part of the traffic management plans for the maintenance works,” the Commissioner stated.

As one of Lagos’ most vital arteries, the Oworonshoki/Third Axial Bridge links several commercial and residential districts, the upcoming repairs are expected to test the resilience of Lagos traffic management systems—and the patience of millions of daily commuters.

StreetReporters.ng

This post has already been read at least 112469 times!

James Ezema

Comrade James Ezema is a veteran journalist and media consultant. He is a political strategist. He can be reached on +2348035823617 via call or WhatsApp.

Recent Posts

HURIWA Demands Immediate Withdrawal Of Nutritionists’ Council Bill, Warns Against Criminalising Nigeria’s Indigenous Food Heritage

The Human Rights Writers Association of Nigeria, HURIWA, has demanded immediate withdrawal of Nutritionists Registration…

12 hours ago

Ogun Police Foils Cult Initiation, Arrests 3 Students, Recovers Weapons

The Ogun State Police Command has foiled a suspected cult initiation in Owode-Yewa, arresting three…

15 hours ago

Ghana’s Petroleum Authority Delegation Visits PTI, Seeks Partnership To Build Oil And Gas Capacity

EFFURUN, Delta State — In a significant move to strengthen regional cooperation and accelerate capacity…

1 day ago

HURIWA Condemns Killing Of Passengers In Sokoto, Demands Intelligence-Led Security Operations

The Human Rights Writers Association of Nigeria, HURIWA, has condemned reported killing of passengers by…

2 days ago

NGIJ Honours Dele Giwa At 40, Announces Annual Lecture, Urges FG To Immortalise Journalism Icon

The Nigerian Guild of Investigative Journalists, NGIJ, has paid tribute to late veteran journalist, Dele…

2 days ago

Cross River ALGON Chairman Showcases Gov. Otu’s Transformational Strides At ALGON 2026 General Assembly

The Chairman of the Association of Local Governments of Nigeria (ALGON), Cross River State Chapter,…

2 days ago